What affects the cost of concrete in Doncaster?

Grade, volume, access, distance, pumping and timing all affect the cost. Every job is priced job by job – ring 01302 238340 or use the contact form.

Concrete is usually priced per cubic metre (m³), with the final cost depending on the grade, the quantity, the supply method, the delivery postcode and any extras such as pumping. This guide explains the factors that affect the cost, so you know what information to send when you ask for a quote.

How we price concrete

We do not publish prices. Every job is priced job by job – ring 01302 238340 or use the contact form. We price on the grade, volume, delivery postcode, access and timing, so the more detail you send, the more accurate the quote.

What affects the price of concrete?

Grade and mix

Higher-strength mixes contain more cement and cost more. Use the grade your engineer or building control has specified; for general domestic jobs we can advise which mix is commonly used.

Volume

Small loads usually cost more per m³ because the delivery cost is spread over less concrete. Minimum loads, part loads, vehicle sizes, charges and delivery times are confirmed when we quote your job – ring 01302 238340 or use the contact form.

Supply method

Ready mix is batched before delivery. Volumetric concrete is mixed on site, which can suit jobs where the final quantity is uncertain.

Access and distance

We supply from Finningley, DN9 3DU. Distance, access and time on site can affect cost. Minimum loads, part loads, vehicle sizes, charges and delivery times are confirmed when we quote your job – ring 01302 238340 or use the contact form.

Pumping

If the vehicle cannot reach the pour, a concrete pump adds cost but can save significant labour.

Timing

Minimum loads, part loads, vehicle sizes, charges and delivery times are confirmed when we quote your job – ring 01302 238340 or use the contact form.

Working out how much you need

Length × width × depth (in metres) gives the volume in m³. A 4 m × 3 m shed base at 100 mm deep is 4 × 3 × 0.1 = 1.2 m³. Our volume calculator adds a 10% allowance. See our guides for shed bases, driveways and extension footings.

Frequently asked questions

How much is a cubic metre of concrete in Doncaster?

It depends on grade, quantity, supply method and postcode. Concrete is priced job by job – ring 01302 238340 or use the contact form.

Is it cheaper to mix concrete myself?

For very small jobs hand mixing may be practical. For larger pours, delivered concrete saves labour and gives a consistent mix.

Do you charge for part loads?

Minimum loads, part loads, vehicle sizes, charges and delivery times are confirmed when we quote your job – ring 01302 238340 or use the contact form.

Are your prices fixed?

Quotes are confirmed for a specific job, date and postcode.

Want a price for your job?

Send the postcode, volume, grade and preferred date.